| Project Detail For: |
Sweep Mechanism Repairs to Plant No.2 Primary Clarifiers |
| Project Stage: |
Awarded
|
| Type of Bid: |
Bid, Service
|
| Department: |
Purchasing |
| Addenda: |
|
|
Other Messages/Files Distributed: |
| Date Sent |
Subject |
Message |
Attachment |
| 03-Nov-09 |
Mandatory Job Walk Information |
The mandatory job walk will start promptly at the designated time. Bidders shall allow ample time to locate the facility, park and sign-in.
Please refer to Section 3.17.2 of the attached bid document, Personal Protective Equipment, for items required to be worn on the plant premises and OCSD job sites. Any person not properly attired will not be allowed to attend the job walk.
Thank you. |
N/A |
|
|
| Project Address: |
22212 Brookhurst Street, Huntington Beach, California
|
| Bid Due Date: |
11/24/2009 prior to 02:00 PM
PST
|
| Bond Information: |
Bid Bond: 0% Performance Bond: 0%
Payment Bond: 0% |
| Bids To: |
Owner |
| Bid Documents or Plans: |
Available from OCSD
$0.00
|
| Mailing Fee: |
$0.00 |
| Refund: |
No
|
| Bid Value: |
$1,400,000.00 |
| Start/Delivery Date: |
N/A |
| Project Duration: |
N/A |
| License Requirements: |
A or C-51 |
| Pre-Bid Meeting: |
Yes
- Mandatory IMPORTANT NOTICE ATTENTION ALL BIDDERS
OCSD Job Walk Safety Requirements must be adhered to. Failure to comply with the following, will result in the Job Walk Attendee not being able to participate in the job walk event.
Job Walk attendees are required to wear closed toe shoes, long pants, no sleeveless shirts, safety glasses (may be prescription with side shields if in process areas), reflective safety vests and hard hats. Only those possessing such attire will be allowed on the job site. OCSD will not provide personal protective equipment to attendees.
|
| Pre-Bid Meeting Date: |
11/10/09 @ 8:00AM |
| Location: |
N/A |
| Contact Information: |
Clarice Marcin, 714-593-7585 Email: cmarcin@ocsd.com
|
| Owner Agent Information: |
N/A
|
| Scope of Services: |
The work involves the rehabilitation of the steel mechanisms inside eleven (11) primary clarifiers at Plant 2. Multiple steel members at various locations at each clarifier have achieved different states of failure due to corrosion and as such, will require cutting, removal, coating, and replacement. All Work inside the clarifiers will be done under confined space work requirements.
|
| Project Details: |
Question cut-off date and time:
November 12, 2009 at 11AM PT
|
| Local Programs & Policies: |
N/A
|
| Additional Notes: |
Please download the Notice Inviting Bids for further details.
|
| Download Instructions: |
Download Instructions
|
|
|
Bid Documents Not Available.
|
|
Project Items List |
Prospective Bidder's List |
Bid Results |
Award |
Back to List
|